Installation Guide
Table Of Contents
- Title
- Contents
- Introduction
- System Description
- Pre-Installation
- Receipt of Equipment
- Site Planning
- Main Rack and Supporting Hardware
- Remote ACUs
- RFUs
- RadioBlades
- RAPs
- URU
- Interconnecting Cabling
- Main Rack Configuration
- RF Planning
- Site Survey
- Alarm Configuration
- Tools Required
- Installation
- Equipment Commissioning
- iDEN Interface
- Power Plant
- RadioFrame System
- Coverage Validation
- Site Acceptance Guidelines
- RadioFrame System Functionality Test
- RadioFrame System iDEN Functionality Test
- Interconnect & Dispatch Setup & Voice Quality
- Packet Data Service Connection and Latency
- Short Message Service
- Handover and Cell Reselection
- Interconnect Connection Stability and SQE Performance
- Dispatch Connection Stability
- Idle SQE Testing and Validation
- System Self-Recovery Test
- Packet Data Stability and Throughput
- Validation of ‘Unable to Key BR’ Alarm
- Rectifier & AC Power Alarms
- iSC-3 Functionality Test
- RadioFrame System iDEN Functionality Test
- Connecting the RFS to the Customer LAN
- Operations and Maintenance
- Appendixes
Method of Procedure
Installation
74 RFN_3.1 Beta
4 Using four screws or bolts, attach the ceiling bracket to the ceiling as shown
in the following diagram.
5 Attach the RFU to the ceiling mount bracket and fully tighten the thumbscrew.
Figure 24 Use the provided bracket when mounting an RFU on the ceiling,
ensuring that all bolts or screws penetrate wood.
4.4.2 Connect the RFUs to the ACUs
1 Connect the RJ45 port labeled MAIN on the top of the RFU to the ACU using
an RJ45-to-RJ45 CAT 5 cable (see the following illustration).
Caution
Do not remove the protective cover from or use the RFU port labeled AUX. Damage may
occur to the RFU, ACU, or both.
2 Verify that the RFU is receiving power and connectivity from the ACU.
The Link and Activity LEDs on the MAIN port should light as green, and the
Activity LED should blink rapidly indicating connectivity. If the LEDs do not
light, verify that the ACU is powered on, and if a URU is installed between the
ACU and RFU, that the URU is receiving power.
3 Complete the next procedure “Insert the RadioBlades” before placing the