User's Manual

MC-Series System Installation & Testing
Scheduled and Unscheduled Maintenance
94 RadioFrame Networks, Inc.
7.9.1 RF Shelf
Figure 29 RF Shelf front view
Figure 30 RF Shelf rear view
7.9.1.1 RF Shelf Replacement Procedure
1
Power down RFN equipment in the following order using circuit breakers on the PDU:
BIC
AIC
RBS 1 (power down RBS 2 and RBS 3 if they are present)
RF shelf 1, 2, and 3
2 Disconnect cabling from the back of the chassis to be replaced.
DIVERSITY