User's Manual

MC-Series Standard Capacity system
998-1019-01 Rev X1
E-4 ©2008 RadioFrame Networks, Inc. MC-Series
Proprietary and Confidential Information
Figure E-2 Test Equipment Connection
E.5.1 Motorola R2660
1. On the R2660, set the 10 MHz STD toggle switch to INT and power it up.
2. Connect the TOR Rx port that is being tested (e.g., 800 Rx1 to test 800 MHz)
to the RF IN/OUT or GEN OUT port on the R2660, depending on the desired
test signal level.
Note: Attenuate as required.
E.6 BER Test Procedure
Commonly, the BER test is performed during the process of commissioning an
MCSC system, and the system has not yet been brought online. If the test is to be
performed on a production system, the system must be taken out of service during a
maintenance window.
For your notes during the BER tests, there is a test notes master form, (Table E.1),
from which you can make copies. This form is useful both to organize your testing
strategy and preserve the record of test results.