5.1 Initial Powering Procedure
1. Verify that the AC power to the Air Conditioner (A/C) is on and the A/C is
operating.
2. Verify that all breakers in the PDU are in the OFF position.
3. Ensure that the power switches on the iSCIII and the EAS are all in the OFF
position.
4. Using the breakers on the PDU, turn up the equipment by completing the
following steps, verifying that each component is operational before proceeding
to the next step.
5. Using the breaker on the PDU and the power switch on the front of the iSCIII,
turn up the iSCIII, and then verify that it is operational and that GPS lock has
been established before proceeding. For more information, refer to the Motorola
document Gen 3 Site Controller System Manual, 68P80801E30-O.
6. Using the breaker on the PDU and the power switch on the front of the EAS,
turn up the EAS, and then verify that it is operational before proceeding. For
more information, refer to the Motorola document Gen 3 Site Controller System
Manual, 68P80801E30-O.
7. Using the breaker on the PDU, turn up the CSU.
8. Configure the CSU according to the manufacturer's documentation and
standards.
9. Using the breaker on the PDU, turn up the ABIC and DRBS, and then verify that
both components are operational before proceeding.
10. Wait approximately 3 minutes for the following indications:
DRBS:
The STATUS LED for each Group will turn green.
The RADIOBLADE TRANSCEIVER STATUS LEDs will turn red and then
green for each present RadioBlade transceiver. If no RadioBlade
transceiver is present, the LED will not light. To verify the contents of the
DRBS, pull out the shelf (powering off is not required) and inspect the
RadioBlade transceivers and their respective status LEDs. Referring to
Figure 5.1, reinsert the DRBS. To do this, press up on one side rail
locking arm and press down on the other side rail locking arm, and then
push the unit into the cabinet.
CRIC
The POWER and STATUS LEDs will turn red and then green. All ABIC
card LEDs will turn green.