User manual
- 12 - 
2.3.  Balances AS 3Y series 
Carefully remove the balance from its packaging, remove the plastic and foil 
transport protective elements. Gently place the balance in its intended place of 
use. Install the weighing pan, and other elements according to below scheme. 
Analytical balances AS 3Y series 
A – balance with reading unit 
  d=0,01mg 
B – balance with reading unit 
  d=0,1mg 
On installing the balance in its 
intended place of use, remove transport 
lock (1) – press the lock gently and turn it 
accordingly to OPEN/CLOSE instruction, 
next remove the lock. Please retain the 
lock should the device be transported in 
the future. Next assembly: 
2 – bottom shield of the weighing  
  chamber 
3 – centering ring  
4 – weighing pan 
5 – pan shield 
On assembling all components, 
connect peripheral devices to the 
balance, and plug the balance to 
mains. Power socket is located at the 
back of balance’s housing. 
Balance with transport lock mounted on 










