3. Installing the WinLink 1000 Units
Æ
To install the ODU:
1. At site A, route the ODU cable from the ODU location (on the roof)
to the IDU location (inside the building). The maximum length is
100m.
2. Mount the ODU unit to the mast or wall, using the mounting kit and
mounting instructions.
Note
Do not tightly secure the ODU until the alignment process is complete
When installing the ODU is important to check that there are no direct
obstructions in front of the ODU between the two link sites.
3. Verify that the ODU mounting brackets are connected to ground.
4. Connect the ODU chassis ground to ground.
5. Connect the RJ-45 connectors to both ends of the cable using the
pinout table and diagram below:
IDU RJ-45 Wire Color Function ODU RJ-45
1
twisted
White/Green
Ethernet (RxN)
1
2 pair Green Ethernet (RxT) 2
3
twisted
White/Orange
Ethernet (TxT)
3
6 pair Orange Ethernet (TxN) 6
4
twisted
Blue
Power (+)
4
5 pair White/Blue Power (+) 5
7
twisted
White/Brown
Power ()
7
8 pair Brown
Power ()
8
2 Installing the WinLink 1000 Units WinLink 1000