User's Manual
Chapter 2 Installation and Setup WinLink1000 Installation and Operation Manual
ODU
Mast/Wall mounting kit plus mounting instructions
WinLink1000 Manager installation CD
Spare RJ-45 connector
• IDU package contains:
IDU
110V/220V adapter
IDU wall-mounting drilling template
Self adhesive label showing the IDU LED operation
Spare RJ-45 connector
Or
• IDU-E Package Contains:
IDU-E
Self adhesive label showing the MAC address and the alternative
community string KEY. Keep this label safe.
For AC model, 110/240 VAC with 3-pin terminal block connector
(green)
For DC model, 3-prong connector cable
Standard 1-U, 19” carrier rack
Spare RJ-45 connector
• External antenna (if ordered)
• ODU/IDU cable at length ordered (optional)
• Technical documentation CD
2.4 Equipment Required
The following is a list of the equipment required for installing the
WinLink1000 hardware.
• RJ-45 crimp tool (if pre-assembled ODU/IDU cable is not used)
• Drill (for wall mounting only)
• IDU and ODU grounding cable
• 13 mm (1/2″) spanner wrench
• ODU to IDU cable if not ordered (Outdoor class, CAT-5e, 4 twisted
pairs)
2-2 Equipment Required 9/18/2006 2:26:00 PM