Operating instructions

Installation DMDVB20 LBST Satellite Modem
2-2 TM138 – Rev. 1.0
Before initially applying power to the unit, it is a good idea to disconnect
the transmit output from the operating ground station equipment. This is
especially true if the current configuration settings are unknown, where
incorrect settings could disrupt existing communications traffic.
The modem contains a Lithium Battery. DANGER OF EXPLOSION exists
if the battery is incorrectly replaced. Replace only with the same or
equivalent type recommended by the manufacturer. Dispose of used
batteries in accordance with local and national regulations.
2.1 Unpacking
The Universal Satellite Modem was carefully packaged to avoid damage and should arrive
complete with the following items for proper installation:
Modem Unit
Power Cord, with applicable AC Connector
Installation and Operation Manual
2.2 Removal and Assembly
The Modem is shipped fully assembled. It does not require removal of the covers for any
purpose in installation.
Always ensure that power is removed from the before removing or
installing any optional modules. Failure to do so may cause damage to
the equipment.
Carefully unpack the unit and ensure that all of the above items are in the carton. If the available
AC mains power at the installation site requires a different cord set from the one included in the
package, then a suitable and approved cord set (for the country where the equipment is to be
installed) will be required before proceeding with the installation.