How to Guide

1
English
Rain+Birdt
CP/CPF Series Valve Installation
and Operation
BODY
INLET
FLOW CONTROL
(select models)
OUTLET
SOLENOID
BLEED
SCREW
Before Installation
Install master valves, pressure regulators and back-
ow preventers as needed.
A pressure regulator is required if water pressure
exceeds 150 PSI (recommended over 80 PSI).
Inline valves require a separate backow preventer
in the main line. Check local building codes.
Flush the system thoroughly until water runs clear.
Shut o the main water supply.
Connect Valve to Pipes
A
Apply PTFE thread-seal tape to the male threads
on the adapters, screw into the valve and
hand-tighten (do not use PVC glue or pipe dope
on adapter threads).
B
Apply primer and then PVC cement to the ends
of the pipe and inside the adapters per manu-
facturers instructions.
C
Ensure the valve arrows face in the direction of
water ow, and push valve onto inlet and outlet
pipes until secure. Follow PVC cement instruc-
tions for cure time.
1 2
TO LANDSCAPE
WATER SOURCE
Connect Valve Wires
NOTE: Use watertight connectors and direct
burial wire for all connections.
A
Connect one solenoid wire to a common wire
(usually white). All valves can share the same
common wire.
B
Connect the second solenoid wire to a power
wire (usually colored).
1
2