Full Product Manual

Table Of Contents
Installation, Maintenance and Troubleshooting Page 73
INSTALLATION, MAINTENANCE
AND
TROUBLESHOOTING
Installation
Installation of low-volume irrigation components, while slightly different from
conventional-system installation, is a straight forward process. The following
steps define a typical low-volume installation.
1. Analyze the site. Compare the site to your irrigation plan and note any
obstructions or discrepancies. Modify your plan to reflect actual site conditions.
2. Locate or mark components. Use chalk or flags to mark the locations of
valves, trenches, etc.
3. Plant large-specimen plant material.
4. Install and set up backflow devices to meet local codes.
5. Trench and lay main line to the control zone.
6. Pressure test the main line.
7. Set valve boxes and install control zone components.
8. Flush the valves.
9. Run lateral PVC pipe or high density polyethylene pipe to riser units. Each
riser unit includes the fittings necessary to connect a 1/2" schedule 80 riser to
the poly drip tubing (typically a compression elbow or tee).
10. Backfill trenches and rough grade.
11. Plant shrubs and trees.
10
®