6. Installation & Preparation
6.1. Preparation before Installation
Please check if the models and part numbers are in consistence first, and also check if the
equipments are damaged. There must be drying process if the equipment is damped.
Please follow the following steps when install and use this equipment:
Carefully read this manual
Prepare all kinds of the cable. Ensure that they are not short-circuited. Refer to
Appendix A for cable making.
Fix and install the equipment
Connect E1 cable
Configure the equipment according to the configuration guide
Use the equipment correctly
6.2. Installation
6.2.1. Cable preparation
The following cables need to be prepared:
Table 6-1 Cable specification for RC953-8FE16E1 connectors
Connector Cable specification
10/100Mbps Electrical
Ethernet connector
(SNMP management
connector)
Cat. 5 100Base-T UTP, and the maximum
length is 100m (prepared by customers)
Connector cable for
E1 (the first 8 E1
utilize one DB37
connector and the
second 8 E1 utilize
one DB37 connector)
Please order the 2 cables separately
For 75ohm unbalanced E1 connector: one end of
the cable is DB37 and the other end are 8
75ohm unbalanced BNC connectors;
For 120ohm balanced E1 connector: one end of
the cable is DB37 and the other end are 8
balanced RJ-45 connectors;
CONSOLE connector
Provide one CONSOLE cable.
Please refer to the appendix for how to make
CONSOLE cable.
Power supply
connector
AC power supply: provide one AC power supply
cable.
DC power supply: provide one DC power supply
cable.