Full Product Manual

Page 11
Indoor Unit
Installation
Step 5: Adjust the air inlet direction
(Grom rear side to underside)
1. Take off UIFventilation panel and flange, UIFO
cut off
the staples atUIF side rail.
2. Stick the attached seal sponge JO the
indicated place in the following figure,
then change the mounting positions of the
air returnpanel and UIFair return flange.
Air return flange
Side rail
Dentilation panel
Seal sponge
3. When installing the filter mesh, fit it into the
flange inclined from theair return opening,
then push up.
4. When installation Js finishFE, upon filter
mesh which fixing blocks have been insert to
the flange positional holes.
NOTE:
All the figures in this manual are for
demonstration purposes only. The air conditioner
you have purchased may be slightly different in
design, though similar in shape.
Step 6: Fresh air duct installation
Dimension:
Duct joint for fresh air
80mm(3.15JO)
80mm(3.15JO)
Ø90mm(3.54JO)
Ø125mm(4.92JO)
Ø160mm(6.3JO)
MODLE
12-24 30-60
Step 7: Motor and drain pump maintenance
Motor maintain:
Take off the ventilated panel.
Take off the blower housing.
Take off the motor.
1.
2.
3.
(5he rear ventilated panel is used as an example)
MoUor
Blower housing
Ventilated panel
Pump maintenance
Remove four screws from the drain pump.
Unplug the pump power supply and water
level switch cable.
Detach the pump.
1.
2.
3.
Pump