Install the braising pan in a well ventilated room for efficient performance. Remove 
any items which might obstruct or restrict the flow of air for combustion and 
ventilation. Clear all combustible material from the area directly around the unit.
1.  Installation on combustible floors is allowed. Ensure minimum clearance to 
combustible and noncombustible construction.
2.  Install the unit under a vent hood.
3.  Level the unit by adjusting the bullet feet or floor flanges on the legs. Be sure 
the tilting mechanism has been turned all the way to the horizontal position. 
Check levelness with a spirit level set on the bottom of the pan body. Anchor the 
rear legs securely to the floor if floor flanges are ordered or required.
4.  Complete piping to the gas service with 3/4” inch IPS pipe or approved 
equivalent.
5.  For unit on casters, the installation shall be made with a connector that complies 
with the standard for Connectors for Movable Gas Appliances, ANSI Z21.69 - CSA 
6.16. Restrain movement of the unit by attaching a cable or chain to the eyelet 
provided at the back of the frame and anchor the cable or chain to the wall or 
floor. Make the length and location of the cable such that the unit cannot pull on 
the gas connection while the cable is connected or quick-disconnect.
6.  The gas connection for a unit on casters must be made with a quick-disconnect 
device that complies with ANSI Z21.41 - CSA 6.9.
7.  For electronic spark ignition, provide 115VAC, 60 HZ, 1 phase, 5 AMP electrical 
service to the field wiring control box at the rear of the electrical console. AN 
ELECTRICAL GROUND IS REQUIRED. The unit must be electrically ground in 
accordance with local codes, or in the absence of local codes, with the National 
Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA C22.2, as 
applicable.
8.  Installation must conform with local codes or with the American National 
Standard Z223, latest edition, National Fuel Gas Code. The pan should be 
installed in an adequately ventilated room with a provision for adequate air 
supply to the unit. The best ventilation will use a vent hood and exhaust fan. DO 
NOT obstruct the flue or vent duct after installation. In Canada, installation must 
conform to CAN/CGA B149 Installation Codes for Gas Appliances and Equipment 
and/or local codes. 
WARNING
INSTALLATION OF THE BRAISING PAN 
MUST BE DONE BY PERSONNEL QUALIFIED 
TO WORK WITH GAS AND ELECTRICITY.  
IMPROPER INSTALLATION CAN RESULT IN 
INJURY TO PERSONNEL AND/OR DAMAGE 
TO EQUIPMENT.
Installation
CAUTION
INSTALLER MUST VERIFY THAT THE 
INSTALLATION COMPLIES WITH THE 
APPLICABLE LOCAL CODES AND 
REGULATIONS. THE UNIT MUST BE 
INSTALLED BY A LICENSED PLUMBER OR 
GAS FITTER WHEN INSTALLED WITHIN THE 
COMMONWEALTH OF MASSACHUSETTS.
WARNING
THIS UNIT IS FOR COMMERCIAL USE. 
NEVER USE HOME OR RESIDENTIAL GRADE 
GAS CONNECTIONS. THEY DO NOT MEET 
GAS CODES AND COULD BE HAZARDOUS.
WARNING
ELECTRICALLY GROUND THE UNIT AT 
THE TERMINAL PROVIDED. FAILURE 
TO GROUND UNIT COULD RESULT IN 
ELECTROCUTION AND DEATH.
Minimum 
Clearance
Recommended Clearance
Left Side
0”
2” for service
6” when faucet is installed on left side
Right Side
0”
12-16” for service
6” when faucet is installed on right side
Rear
3” 12” for service
Electronic spark ignition