? IMPORTANT INFORMATION ? KEEP FOR OPERATOR ? IMPORTANT INFORMATION ? OPERATOR AND SERVICE MANUAL Part Number 128418 Model: OM/SM-TDH-CE INTERNATIONAL TDH-CE Mark Steam Jacketed Kettle Self-contained Stainless Steel Gas Heated Table Mounted Tilting Pull Tilt Model Crank Tilt Model KEEP THIS MANUAL WITH KETTLE DOCUMENTS. OPERATORS AND TECHNICIANS SHOULD READ, UNDERSTAND AND FOLLOW WARNINGS AND INSTRUCTIONS IN THIS MANUAL (THE SERVICE MANUAL AND THE OPERATOR SECTIONS).
OM/SM-TDH-CE IMPORTANT — READ FIRST — IMPORTANT IT IS MOST IMPORTANT THAT THESE INSTRUCTIONS AND THE OPERATOR AND SERVICE MANUALS BE CONSULTED BEFORE INSTALLING AND COMMISSIONING THE APPLIANCE. FAILURE TO COMPLY WITH SPECIFIED PROCEDURES MAY RESULT IN DAMAGE OR THE NEED FOR A SERVICE CALL. THESE APPLIANCES HAVE BEEN CE MARKED ON THE BASIS OF COMPLIANCE WITH THE GAS APPLIANCE DIRECTIVE, EMC AND LOW VOLTAGE DIRECTIVE FOR THE COUNTRIES, GAS TYPES AND PRESSURES AS STATED ON THE DATA PLATE.
OM/SM-TDH-CE TABLE OF CONTENTS Section 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 4 5 5.1 5.2 5.3 Page Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Model Numbers, Net Weights & Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Siting . . . . . . . . . . . . . . . . . . . .
OM/SM-TDH-CE Regulations and Safety Precautions These Appliances have been CE marked on the basis of compliance with the Gas Appliance Directive, EMC and Low Voltage Directive for the Countries, Gas Types and Pressures as stated on the Data Plate. These appliances MUST BE installed by a competent person in conformity with the INSTALLATION AND SERVICING INSTRUCTIONS and National Regulations in force at the time. Particular attention MUST be paid to the following: I.E.E.
OM/SM-TDH-CE 1. Installation UNLESS OTHERWISE STATED, PARTS WHICH HAVE BEEN PROTECTED BY THE MANUFACTURER ARE NOT TO BE ADJUSTED BY THE INSTALLER. 1.1 Model Numbers, Net Weights and Dimensions MODEL, TDH - 20 TDH - 40 WIDTH mm (in) 610 (24.0) 685 (26.9) DEPTH mm (in) 800 (31.5) 830 (32.6) HEIGHT mm (in) 645 (25.4) 725 (28.5) WEIGHT kg (lbs) 98 (215) 110 (240) 1.2 CAUTION THE APPLIANCE FLUE DISCHARGES VERTICALLY FROM THE TOP OF THE UNIT AT THE REAR.
OM/SM-TDH-CE 1.8 1.6 Gas Supply Incoming gas service must be of sufficient size to supply full rate without excessive pressure drop. A gas meter is connected to the service pipe by the Gas Supplier. Any existing meter should be checked by the Gas Supplier to ensure that it has capacity to pass the required rate of gas for the kettle in addition to any other gas equipment installed. The appliance governor is incorporated in the gas control valve which is situated in the control cabinet.
OM/SM-TDH-CE 2. Assembly and Commissioning 2.1 Assembly 2.5 a) Unpack the appliance a) Prior to operation, clean out kettle pan thoroughly using hot water and detergent. Rinse pan thoroughly. b) Place on a firm, level table. Pre-Commissioning Check 2.2 Gas Supply b) Remove all literature and packing materials from the interior and exterior of the unit. Connect the unit to the gas supply and test for gas soundness.
OM/SM-TDH-CE i) Disconnect the pressure gauge from the test point. j) Re-seal the pressure test point and test for gas soundness. Replace in reverse order. 2.5.3 Checking Performance of Controls a) Light the unit as described in Paragraph 2.5.1. Check that the controls produce a healthy spark from the electrode to the earthing post and ignition is smooth and without delay. b) Turn thermostat off and then on.
OM/SM-TDH-CE 3. Servicing and Conversion on the gear housing until grease flows out of the bearings around the shaft. Put a liberal amount of grease on the gear to cover the arc of contact with the gear. Important Before attempting any servicing, ensure that the gas isolating cock is turned off and cannot be inadvertently turned on. Disconnect the electricity supply. Safety Valve At least twice monthly the safety valve requires checking to ensure that it works correctly.
OM/SM-TDH-CE filling must be removed to obtain efficient heating (Paragraph 3.2). information on the data plate for the type of gas being used. 3.2 Jacket Vacuum CAUTION TDH STEAM JACKETED KETTLES ARE DESIGNED TO USE TREATED, DISTILLED WATER ONLY. USE OF ANY OTHER WATER CAN CAUSE LIME ACCUMULATION ON INTERNAL SURFACES, AND WILL VOID ALL WARRANTIES. When the kettle is cold, a positive reading or a reading near zero on the pressure vacuum gauge indicates excess air in the jacket.
OM/SM-TDH-CE 3.5 3.7 Remove Control Panels 3.5.1 Remove Control Cabinet Lid (Turn gas and electric mains off) Remove Low Water Level Control Relay (Turn gas and electric mains off) a) Remove control cabinet lid (Paragraph 3.5.1). a) Remove the 2 screws around the edge of the lid securing it to the control cabinet. b) Remove cabinet side panel (Paragraph 3.5.2). b) Remove the lid. c) Remove low water level control from its base by undoing the two retaining clips. c) Replace in reverse order.
OM/SM-TDH-CE 3.9 e) Withdraw the neon from the control cabinet. Remove Gas Control Valve (Turn gas and electric mains off) f) a) Remove control cabinet lid (Paragraph 3.5.1). Replace in reverse order. 3.12 Remove Thermostat (Turn gas and electric mains off) b) Remove control cabinet side panel (Paragraph 3.5.2). a) Remove panel from kettle base by undoing the retaining screws. c) Tilt kettle until the burners are fully exposed and disconnect the pilot assembly from the burner guard.
OM/SM-TDH-CE e) Remove thermostat phial from kettle base and withdraw the thermostat. b) Disconnect the electrical leads from the water level sensor. f) c) Drain the kettle by tilting the kettle slightly and undoing the low water level sensor. Allow the kettle to drain into a suitably sized container. Replace in reverse order. g) Ensure an adequate sealant is used to seal the replacement thermostat Phial Boss. d) Remove the low water level sensor from the kettle base.
OM/SM-TDH-CE d) If the pilot assembly is to be removed then remove the flame sensing electrode wire (HT lead) from the flame sensing electrode. 3.18 Remove Pressure Gauge (Turn gas and electric mains off) a) Using the correctly-sized spanner, remove the pressure gauge from the kettle jacket pipework. e) Remove the two retaining screws securing the pilot assembly to the burner guard. f) b) Replace with new pressure gauge ensuring that an adequate sealing compound is used.
OM/SM-TDH-CE c) Replace in reverse order. d) Ensure an adequate sealing compound is used to seal the gas control valve. 3.22 Fuse Replacement (Turn gas and 3.21 Filling Valve (Turn gas and electric a) Remove control cabinet lid (Paragraph 3.5.1). electric mains off) mains off) a) Remove filling valve from kettle jacket pipework. b) Remove control cabinet side panel (Paragraph 3.5.2). b) Replace in reverse order. c) Remove fuse from vertical fuse holder.
OM/SM-TDH-CE SYMPTOM WHO WHAT TO CHECK System does not produce a spark. Auth Service Rep Only a. Thermostat, and close the contacts, if they are open. b. AC voltage between terminals “1" and GND. If it is not 230 VAC, check the high limit switch, which should be closed c. Pilot spark gap. Regap, if it is not 7/64 inch (2.78 mm). d. Electrode ceramic for crack or break. e. That the high tension cable is firmly attached and in good condition. If it is cracked or brittle, replace the pilot. f.
OM/SM-TDH-CE 5. User Instructions Regulations and Safety Precautions These Appliances have been CE marked on the basis of compliance with the Gas Appliance Directive, EMC and Low Voltage Directive for the Countries, Gas Types and Pressures as stated on the Data Plate. WARNING TO PREVENT SHOCKS, ALL APPLIANCES WHETHER GAS OR ELECTRIC, MUST BE EARTHED.
OM/SM-TDH-CE 5.1 Equipment Description 5.1.1 General 5.1.2 Available Options Groen model TDH are stainless steel, steam jacketed, table-top mounted, tilting kettles with a self-contained, gas-heated steam source. The kettle body is welded into one piece and furnished with a reinforced bar rim and welded "butterfly" pouring lip. The interior of the kettle is polished to a 180 emery grit finish, and the exterior is given a bright semi-deluxe finish.
OM/SM-TDH-CE 5.2 Lighting and Operation g. Turn the thermostat dial to the required setting. 5.2.1 Initial Kettle Lighting and Operational Readiness Check h. After 10-15 seconds the burners should light. The "heat on" neon will illuminate. After the TDH Kettle has been installed according to service and installation instructions, perform initial start-up as a test to ensure that the unit is operating correctly. Follow the steps below.
OM/SM-TDH-CE d) Tilt cut-off switch that shuts off all burners when the kettle is tilted. 5.2.3 Filling the Kettle Prior to operating the unit, clean out the kettle pan thoroughly, using hot water and detergent. When the kettle reaches the set temperature, the thermostat switch opens, stopping the signal to the gas control valve and causing the valve to shut off all gas flow. When the kettle cools below the set temperature, the thermostat switch closes and starts another heating cycle.
OM/SM-TDH-CE 5.3 Cleaning and Maintenance f) To remove materials stuck to the equipment, use a brush, sponge, cloth, plastic or rubber scraper, or plastic wool with the detergent solution. To minimize the effort required in washing, let the detergent solution sit in the kettle and soak into the residue, or heat the detergent solution briefly. IMPORTANT Disconnect the electricity supply before any cleaning is undertaken. The appliance must not be cleaned with a jet of water nor should it be steam cleaned.
OM/SM-TDH-CE i) When the equipment needs to be sanitized, use a sanitizing solution equivalent to one that supplies 200 parts per million available chlorine. Obtain advice on the best sanitizing agent from your supplier of sanitizing products. Following the suppliers instructions, apply the sanitizing agent after the unit has been cleaned and drained. Rinse off the sanitizing agent thoroughly. 5.3.5 Service-Periodic Maintenance A Maintenance and Service Log is included in this manual.
OM/SM-TDH-CE Parts List 23
OM/SM-TDH-CE Parts List CRANK TILT MODELS PULL TILT MODELS 24
OM/SM-TDH-CE Parts List (Keyed to Drawings on Pages 23 and 24) To order parts, contact your Groen Certified Service Agency. Supply the model designation, part description, part number, quantity, and, where applicable, voltage and phase.
OM/SM-TDH-CE Parts List Gas Valve and Piping Assembly, TDH-20 and TDH-40 Natural and Propane Gas CE Models Electrical Panel Assembly, TDH-40 and TDH-20 CE Models 26
OM/SM-TDH-CE Parts List (Keyed to Drawing on Page 26) To order parts, contact your Groen Certified Service Agency. Supply the model designation, part description, part number, quantity, and, where applicable, voltage and phase.
OM/SM-TDH-CE 28
OM/SM-TDH-CE Service Log Model m _______________________________ Purchased From _________________________ Serial m _______________________________ Location ________________________________ Date Purchased __________________________ Date Installed ___________________________ Purchase Order m ______________________ For Service Call __________________________ Date Service Performed 29 Performed By
OM/SM-TDH-CE Limited Warranty To Commercial Purchasers* (for Areas Outside of the U.S. and Canada) Groen Foodservice Equipment ("Groen Equipment") has been skillfully manufactured, carefully inspected and packaged to meet rigid standards of excellence. Groen warrants its Equipment to be free from defects in material and workmanship for (12) twelve months from date of installation or (18) eighteen months from date of shipment with the following conditions and subject to the following limitations. I.
1055 Mendell Davis Drive Jackson, Mississippi 39272 Telephone 601 373-3903 FAX 601 373-9587 OM/SM-TDH-CE INTERNATIONAL Part Number 128418 Revised October1999