Manual

Set Up
1. Locate a clean, flat area of approximately 15 ft. in diameter
that is free of hard obstructions, abrasive materials, and
sharp objects. Carefully spread out the O-Z
one tube so the
graphics and black jumping surface are facing up.
2. For quick inflation, unscrew the valve body from the valve
base.
3. Using a 110V inflator/deflator or large volume hand pump,
inflate until yellow indicator is between the A
and B marks on the inflation gauge. Quickly
screw in valve body. To top off, unscrew top
valve cap only and add air. To reduce the
amount of air in the tube, turn the lower, main
valve body approximately 1 full turn counter
clockwise or until you hear air escaping.
Note: refer to step 4 if the tube feels too soft
or you are unsure whether the gauge is working properly.
4. DO NOT OVERINFLATE! Inflate only until the jump surface
is taut and the O-Z
one tube reaches a vertical height of
approximately 28” high for the O-Z
one and 36” high for the O-
Z
one XL.
5. Inflate the boarding platform until it becomes firm. Do not
over inflate by continuing to inflate beyond this point. Note: a
firm platform will be easier to board than a soft one.
Note: Some wrinkles may remain in the tube at this proper
pressure and will lessen over time. It is normal for the air
pressure within the tube to fluctuate depending on air and
water temperatures. It may be necessary to check and
3