Brochure

www.RavenProducts.us • email: sales@ravenproducts.us
21
COPPER MANIFOLDS
COPPER MANIFOLD
NAVIEN
®
ASSEMBLY
FOR TANKLESS WATER HEATER
Easy installation for Navien
®
Systems
Saves over 3.5 hours of labor
Eliminates 25 leak paths
Eliminates costly field fabrication
Avoids precise calculations
Simplifies future maintenence
Installation kits to t over 200 dierent boilers and counting
Item # Size Inner Master
NCM112
1-1/2" Tankless Water Heater Copper Mainfold Assembly 1 1
Elect. Water Feed
Boiler
S R
Domestic
H C
Gas
Hydronic
FeedWater
• Substantial Savings on Labor and Materials!
• No measuring or leveling involved • Eliminate 8) 1” sweat connections
• Save an hour of labor • Eliminate 6) measure, cut, and clean operations
• Eliminate 4) 1 1/2“ sweat connections
• Left hand orientation keeps boiler piping clear of domestic water connections
• Union boiler connections with tapping for ¾” PRV
• Factory pressure tested
• Boiler Isolation service valves with purge feature
• Full 1” CTS primary piping
• 1 1/2“ CTS secondary connections
• Optional ¾” FE purge/utility connection
• Compatible with Circulator or Zone Valve Zoning
Primary/Secondary Heating Manifold
for Select Wall Hung Boilers
Circ Zone
Panel
T T T
Optional Purge
Cold Domestic
Hot Domestic
website: www.ravenproducts.us
email: sales@ravenproducts.us
#NCM112
Innovations in plumbing & heating . . .
FOR USE ON NAVIEN
®
TANKLESS WATER HEATERS
NAVIEN
®
STYLE COPPER MANIFOLD ASSEMBLY