Installation Instructions Part 2
6
Chapter 6: Initial test
This section gives details for the initial tests and checks to be carried out once installation is complete.
Chapter contents
• Turn on breakers on page 70
• Marine monitor checks on page 70
• Keyboard checks on page 70
• GPM400 processor checks on page 70
• GVM400 video processor checks on page 70
• SeaTalk
hs
switch on page 70
See also
For help with diagnosing and rectifying faults, refer to
Chapter 9: Troubleshooting.
Before powering up
Before proceeding with the power on test of your system please ensure that:
• Radar and all ancillary equipment has been installed and connected in accordance with the manufactur-
ers instructions.
• All G-Series equipment has been installed and connected in accordance with the G-Series installation
instructions.