User manual

15Dish Network MIM - Installation and User Manual SETUP THE RECEIVER AND RUN “CHECK SWITCH”14
4. After the test is nished, you will see the message with “OK” for all three
satellites Dish 110 °, 119 ° and 129 ° (or 61 °). With dual tuner receivers, you will
see the same results for “Satellite Input 2”. Select the “Done” button to go
to the Point Dish/Signal screen.
5. Select the “Done” and “Cancel” button to exit menu.
2. Select “Check Switch” button and select “Test”. Be sure that “SuperDISH” and
“Alternate” are NOT checked.
3. Wait until the message “Currently doing test #3 of 3” appears. This indicates
the test is completely done. If the message is different, check your connections
again. Make sure the receiver you are running the “Check Switch” on is designated
as the Master receiver. With dual tuner receivers, wait for the “Satellite Input2”
test to be completed. This may take a few minutes.