Installation guide
Table Of Contents
- Contents
- Safety notices
- Important information
- Chapter 1: Installation
- Chapter 2: System and transducer connections
- Chapter 3: Maintenance and troubleshooting

Installation 13
1.5 What’s in the box
Unpack the unit and associated components carefully to prevent
damage. Save the box and packing in case the unit needs to be
returned for service.
Check that all the correct system components are included as
shown in the drawing below.
1.6 Installing the unit
Having selected a suitable location, install the unit using the
supplied hardware.
To install the unit:
1. Using tape, secure the mounting template in the required
location.
2. Drill a 9/64” pilot hole at each of the eight marked locations
on the template.
Not all cable glands are supplied fitted to the unit as shown
above, but will be found loose in the components bag.
Screw,
M6 x 60mm (x8)
Plain washer,
M6 (x8)
Spring washer,
M6 (x8)
Nut,
M6 (x8)
Self tapper screw,
No.12 (x8)
DSM400
Manual
D10978-1
UP
3
4
m
m
(1
.3
4
in
)
4
1
5
m
m
(
1
6
.
3
4
i
n
)
3
9
8
m
m
(1
5
.6
7
in
)
3
0
6
.
5
m
m
(
1
2
.0
6
i
n
)
D
S
M
4
0
0
m
o
u
n
t
i
n
g
t
e
m
p
l
a
t
e
3
3
m
m
(1
.
3
in
)
3
4
m
m
(1
.
3
4
in
)
3
3
m
m
(
1
.3
0
in
)
D10979-1
DSM400 Installation Guide.book Page 13 Tuesday, November 4, 2008 4:53 PM