Operating Instructions and Installation Instructions
3.1Installationchecklist
Installationincludesthefollowingactivities:
InstallationTask
1Planyoursystem.
2
Obtainallrequiredequipmentandtools.
3
Siteallequipment.
4Routeallcables.
5
Drillcableandmountingholes.
6Makeallconnectionsintoequipment.
7
Secureallequipmentinplace.
8Poweronandtestthesystem.
Schematicdiagram
Aschematicdiagramisanessentialpartofplanning
anyinstallation.Itisalsousefulforanyfuture
additionsormaintenanceofthesystem.The
diagramshouldinclude:
•Locationofallcomponents.
•Connectors,cabletypes,routesandlengths.
3.2Partssupplied–Ray50/Ray52
ThepartslistedbelowaresuppliedwiththeRay50
andRay52radios.
D13231-2
1
8 9
7
10
11 12
13
4 5
6
32
x 4
x 4
x 2
ItemDescription
1Radio
2
Suncover
3Panelmountgasket
4Mountingbracket
5
Mountingbracketknobs
6Fistmicmountingclip
7
4xMountingbracketxings
8Documentation
9
4xPanelmountxingscomprising:(nut,
boltandlockingwasher)
10Protectiveantennaboot
11
2xFistmicmountingclipxings
12
SeaTalk
ng®
blankingplug
13
SeaTalk
ng®
400mm(15.7in.)spurcable
16
Ray50/Ray52/Ray60/Ray70