Owner`s manual
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header
Bracket
Chain
Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Rail
Clevis Pin
5/16"x2-3/4"
Ring Fastener
Header Bracket
Chain
Pulley
Bracket
Rail
HARDWARE SHOWN ACTUAL SIZE
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
Position the opener on the garage floor below the header • 
bracket. Use packing material as a protective base. NOTE: If the 
door spring is in the way you’ll need help. Have someone hold 
the opener securely on a temporary support to allow the rail to 
clear the spring.
Position the chain pulley bracket against the header bracket.• 
Align the bracket holes and join with a clevis pin as shown.• 
Insert a ring fastener to secure.• 










