Operating instructions

9
PART TWO
INSTALLATION AND SERVICE INSTRUCTIONS
SECTION 1 - RECEIVING EQUIPMENT
The manufacturer recommends that this manual be reviewed thoroughly before installing your pool/spa heater.
If there are any questions that this manual does not answer, please contact the factory or your local represen-
tative.
On receipt of your equipment it is suggested that you visually check for external damage to the carton. If the
carton is damaged, a note should be made on the Bill of Lading when signing for the equipment. Remove the
heater from the carton. If it is damaged, report the damage to the carrier immediately. Save the carton.
These items are shipped inside a box in the carton with the heater:
STANDARD UNIT
1. Plastic pipe finish flange for gas line 6. (2) 2” CPVC Ring Nuts
2. Bonding lug with mounting screw 7. (2) “O” rings
3. 2” CPVC Slip x Slip 8-3/16” Nipple 8. (2) 2” CPVC tail pieces
4. 2” CPVC Slip x Slip 7” Nipple 9. (2) 3-1/2” Vinyl Grommets
5. (2) 2” CPVC/PVC unions with "O" rings
Be sure that you receive the number of packages indicated on the Bill of Lading.
When ordering parts, you must specify the model and serial numbers of the heater. See below for location of
serial number. When ordering under warranty conditions, you must also specify date of installation.
LABEL ON CARTON
SERIAL NUMBER
The Model & Serial No.
can also be found inside
the bezel above the display
Model & Serial No.
Located on Rating
Plate
O-RING
SLIP
2” TAIL PIECE
2” RING NUT
VINYL GROMMET
CPVC NIPPLE
2” RING NUT
SLIP
2” TAIL PIECE
O-RING
BUTTRESS
TAIL PIECE