User's Manual

P25net Channel Controller Operations Manual
2-2
Shipment should be made prepaid consigned to:
Raytheon Company
Customer Service Department
5800 Departure Drive
Raleigh, North Carolina 27616
USA
Plainly, mark with indelible ink all mailing documents as follows:
U.S. GOODS RETURNED FOR REPAIR
Mark all sides of the package:
FRAGILE - ELECTRONIC EQUIPMENT
Inspect the package prior to shipment to be sure it is properly marked and securely wrapped.
2.4 Installation Overview
Four steps are needed to properly install the P25net CC. These steps are:
1. Provide mechanical mounting for the unit. See Section 2.5 for instructions regarding air
circulation requirements and other mechanical mounting considerations.
2. Provide the proper primary power for the unit; see Section 2.6 and 2.7.
3. Interconnect the unit with the communications system via the unit's rear panel
connectors; see Sections 2.8 and 2.9
4. Calibrate the radio to the P25net CC using Personal Computer Calibration Tool (PCCT)
as covered in Section 3.