Installation Guide

11
ENGLISH
10.
Secure the bottom mounting base to the
deck or the support surface with low-prole
fasteners (Fig. 20). Do not forget the gasket
on ACQ lumber or concrete.
NOTE: For concrete mount, pre-drill with the
masonry bit and secure with 4 low-prole
masonry fasteners.
11.
OPTIONAL: Install Adjustable 4 piece
Trim Ring (73018131). To size the 4-piece
Ratchet-lock Trim Collar, refer to the markings
on the underside of each piece.
Tip:
4" posts will require all 8 pieces to be
trimmed to 4" mark. 5" posts will require all
eight pieces to be trimmed to 5" mark.
Snap the trim collars together at the top
and bottom of the turned porch post (Fig.
20). Slide each trim collar tightly against the
mounting surface and secure to the vinyl
post sleeve with vinyl adhesive, if desired.
(Fig. 20) (Fig. 21)