Installation Guide

(Fig. 9)
(Fig. 10)
(Fig. 12)
(Fig. 13)
(Fig. 14)
4.
Lay the bottom lineal on a clean, non-
abrasive surface (Fig. 12). Orienting the
tabs (Fig. 13) to engage the aluminum
stiffeners, insert a crimped baluster into
the second routed hole from each end.
Distribute the remaining crimped balus-
ters evenly throughout the section. Then
connect the top lineal (Fig. 14).
(Fig. 15)
(Fig. 16)
(Fig. 17)
5.
Hang assembled section between
posts on installed brackets (Fig. 15) and
secure top and bottom lineals using 2
supplied set screws in each bracket
(Figs. 16, 17).
NOTE: Mounting brackets are supplied
pre-mounted to all posts for level railing
installations. Stair mounting brackets
are sold separately. Check post box
contents for details.
Tab
3.
Locate and mark the center point on the
underside (unrouted side) of the bottom
rail. Attach the rail support to the bot-
tom rail as shown below (Fig. 11) using
the supplied hardware.
(Fig. 11)