Installation Guide

ENGLISH
8
STAIR RAIL CONTINUED
(Fig. 24)
12.
Install #6 x ¾" set screws (F) on inside of
rail only, ensuring set screws connect the
beam with the bracket. Fasten in the location
shown in Figure 22; this should be as close
as possible to the inside face of the bracket
so that the screw still embeds, as you did for
the bottom beam.
Once in place, insert the remaining balusters
onto the bottom rail plugs (B) (Fig. 24). Glue
the three balusters in the middle of the rail
section onto the baluster plugs using the
supplied PVC glue. Place the glue inside the
baluster, then place the baluster over the
plug to glue it in place.
(Fig. 25)
(Fig. 26)
13.
Set the top beam (D) in place by inserting the
rst baluster plug (at the bottom post) in the
corresponding baluster, setting it in place, and
working towards the top (Fig. 25).
Position the beam between posts to ensure
proper alignment. Pre-drill the post for the
center bracket screw using a
1
/
8
" drill bit.
Secure the brackets to the post using 3 #10
x 2.5" mounting screws (G) in each bracket,
beginning with the center screw hole (Fig. 26).
(Fig. 28)
14.
Pre-drill downward using a
1
/
8
" drill bit. Be
sure to drill through the beam and bracket
(Fig. 27).
If needed, an additional rail stiffener (N) can
be purchased separately, and installed in
place in top rail (A) as shown below.
Cut the top rail (A) to length at the stair angle
(Fig. 28).
(Fig. 27)
If using stiffener,
insert into top of
top rail as shown.
Stiffener shape will
vary based on top
rail prole.