Installation Guide
ENGLISH
8
(Fig. 22)
(Fig. 21)
13.
If needed, an additional rail stiffener (N) can
be purchased separately, and installed in
place in top rail (A) as shown below.
Measure for length (Fig. 21) and cut the top
rail (A) with stiffener (N) to t (Fig. 22).
Top rail proles: Emerge, Presence, Aspire
If using stiffener,
insert into top of
top rail as shown.
Stiffener shape will
vary based on top
rail prole.
(Fig. 19)
Front of bracket
12.
Set bracket screw alignment tool next to rail
post. Using a
1
/
8
" drill bit (Fig. 19, 20), drill
from top of tool through top bracket and
beam. Repeat on other end of rail.
Tip: Ensure drill bit is long enough so that
drill chuck does not damage post.
(Fig. 23)
(Fig. 24)
14.
Snap the top rail (A) onto the top beam (D).
Work from one end of the rail to the other
until the full length of the top rail locks into
place (Fig. 23).
Using the #10 x 2" painted screws (J) install
two of the screws upward from underneath
through the pre-drilled location. This will
secure the bracket, beam, and top rail
together (Fig. 24). Repeat for the other end of
the rail.
½"
(Fig. 20)