Instructions / Assembly
3
(Fig. 1)
(Fig. 2)
C - bottom beam
1.
Prepare all posts and mounting surfaces
before installation. If using a trim ring, be
sure to install trim ring prior to fastening
bottom beam.
NOTE: Check with your local building
code of๎ ce for design load requirements
for guard rails and bottom space
requirements. All supporting structures
should be built in accordance with
applicable building codes.
2.
Establish the level placement of the
lower rail so that there is no more than
a 4" space from the bottom of the rail to
the standing surface. Mark the post or
mounting surface at this dimension to
determine the bottom rail height (Fig. 1).
Tip:
Transform measures 36" or 42" in height
with a 2" space below the bottom rail,
depending on product selection.
3.
Measure the ๎ nished opening space
between surfaces where the railing is
to be installed and mark the bottom
beam (C, no routed holes) to match this
measurement (Fig. 2).
LEVEL RAIL KITS










