Installation Guide
ENGLISH
4
1.
Prepare all posts and mounting surfaces before
installation. If using a trim ring, be sure to install
trim ring prior to fastening bottom beam.
NOTE: Check with your local building code
ofce for design load requirements for guard
rails and bottom space requirements. All
supporting structures should be built in
accordance with applicable building codes.
2.
Establish the level placement of the lower
rail so that there is no more than a 4" space
from the bottom of the rail to the standing
surface. Mark the post or mounting surface
at this dimension to determine the bottom
rail height (Fig. 1).
Tip: Transform measures 36" or 42" in
height with a 2" space below the bottom
rail, depending on product selection.
3.
Measure the nished opening space
between surfaces where the railing is to be
installed and mark the bottom beam (C, no
routed holes) to match this measurement
(Fig. 2).
(Fig. 1)
(Fig. 2)
C - bottom beam
LEVEL RAIL