Installation Guide

12
7830 Freeway Circle, Middleburg Hts, Ohio 44130 | 1-877-265-2220 | barretteoutdoorliving.com
Fig. 18
Fig. 19
Fig. 20
Fig. 21
8
9
10
1
11
Remove bracket from ends of rail assembly. Aligning bracket and
base with the pencil mark from Step 7, fasten with two provided
#10 x 1" Pan Head screws (Fig. 18). Bottom bracket uses one
#10 x 1" Pan Head screw.
Repeat this for each bracket.
Place brackets back on rail ends, then place rail assembly on
spacer (Fig. 19). Fasten brackets to post using four #10 x 1
1
2"
screws provided, aligning brackets to pre-drilled holes from Step 8.
Once all four brackets are fastened to the posts, pre-drill through
bracket, rail and aluminum insert (if used) with a
1
8" drill bit, in two
places for each bracket. Next, fasten with two supplied
#10 x 1" flat head screws (Fig. 20).
Repeat this step for each bracket.
Add two screw covers and two screw caps to each bracket.
NOTE:
Top bracket uses four #10 x 1
1
2" screws, two #10 x 1" flat head
screws and two #10 x 1" Pan Head screws.
Bottom bracket uses four #10 x
1
2" screws and one #10 x 1"
Pan Head screw.
(From Step 9)
#10 x
1
2"
#10 x 1"
III. Field Cut Angle Bracket:
a. Slide handrail bracket over ends of railing (Fig. 21).
Measure angle required and cut bracket and rail
(and aluminum channel) to that angle.
b. Repeat for bottom rail.
c. Install railing per instructions for stair railing.
NOTE:
You will want to cut the angle bracket enough to keep your
spacing between your post and first baluster at a minimum
(4" or less)
To obtain and review a copy of the warranty please go to: http://www.barretteoutdoorliving.com/warranty/
You can also contact 1-877-265-2220 to obtain a copy of the warranty.