Installation Guide
2
7830 Freeway Circle, Middleburg Hts, Ohio 44130 | 1-877-265-2220 | barretteoutdoorliving.com
4
5
Installing Bottom Rail:
a. If installing a 10' kit, locate and mark the center point on
the underside (unrouted side) of the bottom rail. Attach the
crush block to the bottom rail as shown below (Fig. 5) using
supplied set screw.
b. Place brackets onto both ends of bottom rail (Fig. 6).
c.
Slide bottom rail in between posts and rest on top of wood
spacer blocks (Fig. 7).
d. Ensure bracket is centered to post. Then, using
1
⁄8" drill bit,
pre-drill first bottom bracket screw hole through bracket hole
and post (use the four outside corner holes) (Fig. 8).
e. Drive the first #10 x 1
1
⁄2" screw through bottom bracket into
post (Fig. 9).
f. Repeat steps c & d for the remaining three screws for the first
bottom bracket.
g. Repeat steps c, d & e for the second bottom bracket.
Snap Balusters Into Your Bottom Rail
a. The kit comes with two balusters with lock tabs on end.
Install those two balusters on the ends closest to posts.
b. Push all balusters into bottom rail (Fig.10).
Fig. 6
Fig. 5
Fig. 7
Fig. 8
Fig. 10
Fig. 9
NOTE:
Finyl Line 10' rail kits include a crush block which should be
installed to bottom rail (step a below) prior to attaching rail to
brackets.