Installation Guide

6
7830 Freeway Circle, Middleburg Hts, Ohio 44130 | 1-877-265-2220 | barretteoutdoorliving.com
6
7
8
Pre-drill one
1
8" diameter hole through top rail and aluminum
insert for each side of top rail brackets only. Fasten with #10 x 1"
flat head screws (Fig. 8).
Add two screw covers for both top and bottom brackets and
add two screw caps for each top rail bracket (Fig. 9).
Repeat installation process for each additional rail assembly.
Fig. 8
Fig. 9
Fig. 10
Finished Installation
5
Attach each top rail bracket with four #10 x 2" screws (Fig. 7).
Attach each bottom rail bracket with four #10 x 1
1
2" screws.
Fig. 7