Installation Guide

8
7830 Freeway Circle, Middleburg Hts, Ohio 44130 | 1-877-265-2220 | barretteoutdoorliving.com
Fig. 3
Fig. 4
Fig. 5
Fig. 6
3
1
5
Assemble Your Stair Railing Section:
a. Kit comes with two balusters with lock tabs on end. Install
those two balusters on the ends closest to posts
b. Assemble your stair railing section by snapping balusters into
bottom rail (Fig. 3)
Stabilize Section:
a. Place assembled stair railing section adjacent to mounted stair
posts, leaving equal distances from the ends of both balusters
and clamp your stair railing section to the posts (Fig. 4).
b. Trace the post onto each rail (both ends of top and bottom
rails). Make four marks in total being sure to mark
1
8" shorter
to allow for expansion (Fig. 5).
Cutting Rails:
Remove clamped stair kit from posts. Cut along all four angled
marks on rails (Fig. 6).
1
8"
Clamp
I. Using pre-molded brackets:
NOTE:
Finyl Line top rails are reinforced with an aluminum channel.
Please check the inside of your top rail prior to installation. If it
uses a shape other than a capital "H", then be sure to orient that
rail so the long part of the aluminum faces the Inside of the deck
(Fig. 2).
Fig. 2
Deck
Side
Any
Side