Instructions / Assembly

3
BEFORE YOU BEGIN
Supplies
Locate and organize all necessary supplies prior to beginning installation.
- Razor knife
- Reective tape with acrylic adhesive
- Tape measure - Gloves (optional)
Safety Check
- When working near electrical circuits and outlets, basic precautions should be observed;
power should be turned o until installation is complete.
- Wear proper eye protection
Local Building Codes & Ordinances
Always check with local building codes prior to using the product or assure adherence of
building codes and guidelines.
WARNING:
Please consult an experienced building and/or construction professional with regard to
installation and use of this product.
Reective insulation is not recommended for use in certain applications, including “open-air”
structures, structures without exterior walls, structures with partial exterior walls, or structures
in which the insulation will be exposed to the exterior elements, sunlight, moisture, and/or
intense heat.
Reach Barrier Reective Air Insulation is subject to a 10-Year Manufacturer’s Limited Warranty.
For a complete copy of the Warranty and a complete copy of the Installation Guide for this
product, please visit: WWW.REACHBARRIER.COM