Use and Care Manual

SYSTEMS
TM
Inspiring. Timeless. Enduring.
realstone
RECLAIMED WOOD PANELS
ACCLIMATION RECOMMENDATIONS
Due to natural moisture absorption in wood products, an acclimation period is
recommended. To acclimate the Reclaimed Wood panels, unbox and unwrap all
pieces for the installation and let acclimate for 3-5 days in the space and climate the
product will be installed. This process allows the wood to adjust to the humidity
and temperature conditions of the installation site.
For detailed information see page 2.
INSTALLATION TIPS
Carpentry or wood installation tools must be used, wet saw usage is not recommended.
• Substrate wall looks best painted a dark color since it may be visible through the knot holes.
• Cut the mesh from around the knot holes so it is not visible on the front of the application.
• We recommend Bostic Climb, Bosti-Set or equivalent adhesive for wood installation.
• Use small finishing nails for additional support.
12”
24”
For additional information and project photos visit www.realstone.com
WATCH THE INSTALLATION
VIDEO ON OUR WEBSITE
AND YOUTUBE CHANNEL
For installation instructions always refer to local building codes and consult your trained installation professional.
REALSTONE DISCLAIMS ALL LIABILITY FOR THE INSTALLATION OF THE PRODUCTS PURCHASED, AND LEAVES UP TO THE CUSTOMER AND CUSTOMER’S TRAINED INSTALLATION PROFESSIONAL
THE SELECTION OF THE MATERIALS AND METHODS APPROPRIATE FOR THE USE AND INSTALLATION OF THE PRODUCT IN THE CUSTOMER’S SPECIFIC LOCATION AND CIRCUMSTANCES.

Summary of content (2 pages)