Assembly Instructions
STEP 5: Guide each tube into socket and gently tap
to hold in place.
STEP 2STEP 1 STEP 3
Assemble on
solid surface
DO NOT assemble
on soft surfaces
such as carpet
or damage will
occur.
Assemble all parts on a smooth, hard surface
such as wood or concrete.
The ends of the steel tubes
are intentionally indented to
ease assembly.
Indentation
Firmly hammer tubes all the way into
each socket. If this is not done, the
product will not stay together.
STEP 2:
STEP 8: Lay completed assemblies end to end facing the same direction.
Firmly hammer tubes into each of the eight (8) sockets.
Tap tubes all the
way into sockets.
Line up tubes with sockets.
CURVES OF SIDES MUST FACE
IN THE SAME DIRECTION
Rotate clockwise, turning assembly over.
STEP 3:
TURN PAGE OVER FOR REMAINING STEPS
Repeat Steps 2-6 with
remaining sides and tubes.
VERY IMPORTANT!
ATTENTION: Assemble all parts on a solid surface (not carpet) or damage will occur!
OVERDOOR SHOERACK PARTS LIST
Hanging Brackets (2)
Frame Sides (6)
Steel Tubes (24)
STEP 5
STEP 4
STEP 4:
CURVES OF SIDES
MUST FACE IN
SAME DIRECTION
STEP 6
STEP 6: Firmly hammer tubes all the way into
sockets. If this is not done, the product
will not stay together.
STEP 7
STEP 8