Installation Guide
Installation Considerations SAFETY TIPS These products should be located and mounted to a wall stud. While it is possible to mount them to any surface, a stud mounted product will yield the best results. WARNING! This item is not designed for use as a grab bar. Do not mount in locations where product is likely to be used as a grab bar. Keep this booklet and the receipt (or other proof of date and place of purchase) for this product in a safe place.
For corner basket. 4 For Ceramic Tile. Using the basket as a template, mark the positions of the screw holes. Drill 1/4” pilot holes and insert the plastic anchors into drilled holes using a hammer to tap the anchors flush with wall. Secure the basket. 5 6 For drywall into Studs. Drill 1/8" holes, secure the basket. For drywall Between Studs. Drill 5/16” holes, Use the anchors to secure the basket. Note: Anchors is not provided. 7 For front basket.
9 Screws go throught the nuts and screw the product onto the wall. Note: screw, nuts with caps are in the installation part pacakge. 10 Tighten the decoration cap onto the nuts after fix the products. Cleaning Instructions: To maintain and protect the fine luster of all bath accessories, clean with a soft, damp cloth only. DO NOT USE scrub pads, detergents or cleansers as they may harm the protective finish of your bath accessories.