ASSEMBLY AND INST. ELATION INSTRUCTIONS { WARNING: TO AVOID RISK.OF ELECTRICAL SHOCK, BE SUREFOOTED OFF. POWER WHILE INSTALLING OR SERVICING THIS FIXTURE, NOTE; Before installing, consult local electrical codes foi wiring and grounding requirement. ‘* FOR CHANDELIER-2: 1. Thread the tubes(A) onto the nipple piece by “piece, then thread swivel into top of the tube tightly. ‘2. Thread 2 mounting screws properly into the 2 relevant mounting holes per-drifled on the cross bar.