User guide

2020
4-INSTALLATION AND ASSEMBLY4-INSTALLATION AND ASSEMBLY
PREPARATION AND UNPACKING
The COMPACT boiler is supplied complete with all its electrical and mechanical components and factory-tested:
Open the package and remove the two screws between the bracket and the boiler and the two screws that fasten the bracket to the pallet.
Set the boiler in the pre-selected place, making sure this complies with the requirements. The boiler body or unit must always be kept in
a vertical position when handled and moved by using carts only. Pay particular attention to the door and its glass, protecting them from
mechanical knocks that would compromise their integrity.
Always handle the product with care. If possible, unpack the boiler near the chosen place of installation. The materials that make up the
packaging are neither toxic nor harmful, and so require no particular disposal measures.
The product, as shown in gure 2, is equipped with a hook to ease handling.
After removing the packaging make sure that the boiler is complete and not damaged:
if in doubt contact the dealer.
The product packaging contains the following documents:
• System booklet
• Instructions booklet
• Annex G - Technical inspection report for heat system with heat output below 35 kW.
• Warranty
FIGURE 1 - REMOVING THE PACKAGE SCREWS
FIGURE 2 - HOOK FOR HANDLING