User Manual

INSTALLATION
The 150psi Oil Pressure Sensor needs to have its 3 wires plugged into the correct
positions on your 52mm REDARC Gauge.
The 3 wires on the sensor need to be pushed into the holes on the connectors as
shown.
1. The Blue wire needs to be pushed into the spare hole on the 7 way.
2. The Green wire needs to be pushed into the end hole on the 6 way connector as
shown below. Cut the terminal off and splice the wire onto the existing wire. Make
sure you tape the splice after soldering.
3. The Red wire needs to be pushed into the next spare hole or spliced onto the wire in
the 6 way connector as shown below.
When routing the sensors wiring, be sure to keep the wiring away from injector and or
high tension leads. REDARC recommends that the wiring be covered in conduit.
Once you have installed the wiring in the correct position on the connectors, power up
the Monitor, and perform the programming as shown in your gauge manual.
2
Programming
Switch
Yellow
Black
Purple
Brown
Green
Red
7-way power
connector
Orange
Grey
6-way
connector
Yellow
Orange
Yellow
Red
Green
Splice wires
as necessary
Blue