Pro Residential, Post Frame and Metal Building Applications

Staple the product to the rafters at 2” to 3” intervals.
Leave a 2” to 3” gap on each side of the roof peak and a gap at the lower edge of the roof line
(within 18” OK depending on roof pitch).
Staple to the face of the studs on gables and insure at least a 1” gap around all vents.
2. Staple to the Deck Method - Southern Zone of the USA Only
For the Regional Recommendation for this Installation Method, please verify the location of your home with
the “Zip Code Zone Locator” function on the “Application - DIY - Attic” webpage at www.reflectixinc.com
It is easiest to install either 16” or 24” wide product (depending on rafter spacing).
Begin at the top of the cavity. Run product flush to the decking, parallel to the rafter.
Staple sheet directly to the deck (nails poking through sheet from above will not interfere with
performance).
Do not block any venting (cut around).
No need to cover rafters (no loop around).
3. Truss Cavity or Side of Rafter Method
Utilize either 16” or 24” Reflective/Bubble product (depending on truss/rafter spacing).
Product will be installed parallel to the truss/rafter direction.
Begin at the top of the cavity.
Staple the product (either Staple Tab (ST Reflective/Bubble) or the edge of the BP Reflective/Bubble
product) to the side of the top chord of the truss (the structural 2”x 4” (or 2”x 6”) that is attached to
the roof decking) or the side of the rafter.
Continue down length of truss/rafter stapling at 2” to 3” intervals - Repeat on opposite truss/rafter.
Allow for proper ventilation. See note below on ventilation.
A minimum of a 1/4” continuous air gap should be present between the product and the roof decking
Do not staple the product directly to the deck - This product is not perforated and could potentially
condensate.
Do not block any venting (cut around).
Ventilation: Good ventilation in your attic increases your comfort and helps the materials of your house last
longer. Be sure not to block ventilation paths when you install Reflectix
®
.
Review These Important Safety Guidelines Prior to Installation:
ALWAYS check local building codes before installing Reflectix
®
.
ALWAYS check the area you are insulating and make any needed repairs. Any worn wiring should be replaced before you begin installing Reflectix
®
.
ALWAYS make sure work areas are well ventilated and well lighted.
ALWAYS use eye protection when operating a staple gun.
ALWAYS use caution and common sense when using a staple gun. Be aware of where electrical wiring is located. Stapling into a wire can cause
severe shock or death. NEVER staple into electrical wiring.
ALWAYS be careful when working with large pieces of Reflectix
®
on windy days.
When installing Reflectix
®
on bright sunny days, it is best to wear sun glasses.
Do not work in areas such as attics when temperatures are too hot.
Visit our website at www.reflectixinc.com for additional product and installation information.