INSTALLATION
a
l -
/
4"
UNIT ASSEMBLY PRIOR TO INSTALLATION
BEFORE YOU START
The Top Facing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the replace is
moved into position.
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a at position and must be folded into shape and attached.
1) Remove the standoffs from the replace top.
2) Take each standoff and bend into the correct shape. Bend up at the bend lines until
the screw holes in the standoff and the pre-punched screw holes on the replace
top line up.
3) Attach the standoff securely to the top with 2 screws per standoff (on opposite
corners).
TOP FACING SUPPORT
Determine the total thickness of facing material (e.g. drywall or wood plus ceramic tiles) to
allow the nished surface to be ush with the front of the unit. Total facing thickness can vary
from 1/2" (13mm) to 1-1/4" (32mm) thick.
The Top Facing Support can be mounted in
3 different positions depending on the
thickness of the facing material.
1) Mount Top Facing Support using the 3 supplied screws into the three pre-punched screw
holes on the top front of the unit. Use hole positions A, B, or C depending on your facing depth.
Screw Facing Material
Position Depth
A 1/2" / 13mm
B 7/8" / 22mm
C* 1-1/4" / 32mm
* For "C" screw position the top facing
support is reversed.
Top Facing Support
A
B
C
Screw holes for
Top Facing
Support
Top Facing Support
is reversed
for “C” hole position
A
B
C
"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.
Top Facing
Support
SIDE NAILING STRIPS
The side nailing strips come attached to the unit.
There are 2 plates, one on the top and bottom
that can be folded out as required depending on
the facing depth as per chart shown.
Facing Material
Depth
1/2" / 13mm
7/8" / 22mm
1-1/4" / 32mm