t User guide

U32-5 FPI Direct Vent Gas Insert
9
INSTALLATION
D
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1) Ensure that structural members are not cut
or weakened during installation.
2) Ensure proper grounding using the #8
ground lug provided.
3) Appliance must be anchored to the oor
with the supplied anchoring methods.
MATERIALS REQUIRED
No electrical power supply is required for the gas
control to operate. A 120 Volt AC power cord is
hooked up to the fan. Plug the 3 wire cord into
a suitable receptacle. Do not cut the ground
terminal off under any circumstances. When
connected with 120 volts, the appliance must
be electrically grounded in accordance with
local codes, current version of CSA C22.1 (in
Canada) or in the absence of local codes, with the
National Electrical Code ANSI/NFPA 70-1987.
INSTALLATION
CHECKLIST
Before installing vent system ensure that the damper
plate is open and secure to prevent the damper plate
from falling down and crushing the liner.
The FPI Gas Insert is installed as listed.
1) Check all clearances to combustibles, (Refer to
sections "Minimum Fireplace Dimensions and
Clearances to Combustibles)
2) Make the gas connection. (Refer to section
"Gas Connection")
3) Install the 3" ue liner to the sliding connector
plate. (Refer to section "Flue Liner Installation.")
4) Slide the unit half way into the replace.
5) Pull the vent connector plate through the tapered
brackets and fasten to the front plate. Refer to
section "Flue Liner Installation.")
6) Slide the unit fully into the replace.
7) Test gas pressure (Refer to section "Gas Pipe
Pressure Testing"). Check aeration system
(Refer to section "Gas Insert Aeration System").
8) Install standard and optional features. Refer
to the following sections:
a. Brick Panel
b. Log Set
c. Faceplate & Trim
d. Standard Flush Door
e. Flush Trim
f. Flush Louvers
g. Full Screen Doors
h. Wall Thermostat
i. Remote Control
9) Final check: Before leaving this unit with the
customer, the installer must ensure that the
appliance is ring correctly. This includes:
a) Clocking the appliance to ensure the correct
ring rate.
b) Adjusting the primary air, if required, to
ensure that the ame does not carbon. See
"Gas Insert Aeration System" section.
c) Ensuring that the appliance is venting
correctly.
MINIMUM FIREPLACE
DIMENSIONS
The minimum replace clearances & dimensions
for the FPI gas insert are shown in the following
diagrams:
Diagram 1
Combustible Mantel Clearances
with Flush Louvers in Masonry
and Factory Built
Fireplace Installation
Diagram 2
CLEARANCES TO
COMBUSTIBLES
Minimum Clearances to Combustibles
From Unit
Sides A 10" / 255 mm
Ceiling B 47.5" / 1205 mm
Mantel C see Dia. 2 & 3
Max. Mantle Depth G 12" / 305 mm
(see Dia. 2)
Min. Alcove Width K 48" / 1220 mm
Max. Alcove Depth L 36" / 915 mm
*No Hearth Required
Faceplate
Flush
with
Floor
Combustible
Flooring
Mantle
C
12" Max.
G
Max Lentil
Bar Depth
A
Height
B
Depth
C
Width
(rear)
D
Width
(front)
E
Regency
Countour
Faceplate
9" 22" 14" 22-1/2" 26-1/2"
Full
Screen
Doors
9" 22" 14" 22-1/2" 26-1/2"
Low
Pro le
Faceplate
8-1/8" 22" 14" 22-1/1" 26-1/2"