Operating instructions

Masport Freestanding Woodstove
8
INSTALLATION
GLASS INSTALLATION
Remove the door from the stove and remove
the glass retainer. Position the glass in the
door, make sure that the glass gasketing will
properly seal your unit, and replace the retain-
er, it should rest on the gasket not the glass.
Tighten securely, but do not wrench down on
the glass as this may cause the glass to break.
BRICK INSTALLATION
Firebrick is included to extend the life of your
stove and radiate heat more evenly. Check to
see that all firebricks are in their correct posi-
tions and have not become misaligned during
shipping.
The "AD" brick in the drawings above is the
brick covering the Ash Dump hole that is used
when the Ash Drawer Kit is installed.
DOOR HANDLE
Attach spring handle by rotating counter clock-
wise onto rod. Ensure that the rod fits into the
entire length of the spring handle. See Diagram
below.
STEP-BY-STEP
OPTIONAL
ACCESSORIES
INSTALLATION
The pieces listed below can be purchased and
installed during the initial installation or added on
later.
Pedestal Ash Drawer Kit (850-100)
1) Remove the bricks from the floor of the
firebox.
2) If using ashdrawer, discard cover plate.
3) Remove the ash dump cover plates (one
inside the firebox and one on the underside
of the firebox) by removing the two nuts
and bolts holding the 2 plates together from
inside the firebox.
4) Push the ash plug into the hole inside the
firebox and replace all the bricks except for
the brick over the ash plug. See brick dia-
gram.
See page 10 for Ash Drawer Operating
instructions.
5) Place the ash drawer lid inside the pedestal,
and the ash plug tool beside the lid, then
slide the ash drawer inside so it sits on top
of the lid.