Installation Guide

Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the track by measuring up from the door
height (H) + 1 3/4" to the centre of the track. This ensures
a gap of 3/8" - 1/2" at the bottom. Ensure the track is level and
leave a minimum of 2" from the end of the track to the side
of the opening (as shown).
If installing with an opening for 80" standard door size, remove
the top trim and cut the side trim horizontally along the height
of the opening.
NOTE: The 96" track features an additional hole for wider
door opening sizes.
acmesystemsandhardware.com
Step 5. CONCRETE Wall Preparation
Position the track in place ensuring that it is level, mark the
holes on the track using a pencil and pre-drill 5/16" holes
into the concrete.
NOTE: The 96" track requires an additional 6th hole to
be drilled.
Step 6. CONCRETE Track Installation
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the track inside
the rst hole.
NOTE: The 96" track features an additional hole for
additional wall spacer and carriage bolt for concrete
installation.
Door Height + 1 3/4
"
3/8" (9.5mm) –
1/2" (12.7mm)
Gap under
the door
78 3/4" (2000mm)
Minimum
2"
(51mm)
1 3/8" (30mm)
5/16" (8mm)
BD100K-07800 / BD100K-09600 INSTALLATION GUIDE
BARN DOOR HARDWARE STRAIGHT STRAP KIT
3