User`s manual
Section 2 Software Specifications when Using the SH7147 Group Debugging MCU Board
Rev. 1.00 Apr. 04, 2008 Page 27 of 30
REJ10J1828-0100
Figure 2.6 [Performance Analysis] Dialog Box
For measurement tolerance,
• The measured value includes tolerance.
• Tolerance will be generated before or after a break.
Note: When [Ch2 to Ch1 PA] or [Ch1 to Ch2 PA] is selected, to execute the user program,
specify conditions set in Event Condition 2 and Event Condition 1 and one or more items
for performance measurement.
(b) Measurement item
Items are measured with [Channel 1 to 4] in the [Performance Analysis] dialog box.
Maximum four conditions can be specified at the same time. Table 2.15 shows the
measurement items.