Technical information

20
Figure 2.1 [Source] Window at Execution Halted (Sequential Break)
If the sequential condition, performance measurement start/end, or point-to-point for the internal
trace is set, conditions of Event Condition to be used will be disabled. Such conditions must be
enabled from the popup menu by clicking the right mouse button on the [Event Condition] sheet.
Notes: 1. If the Event condition is set for the slot in the delayed branch instruction by the
program counter (after execution of the instruction), the condition is satisfied before
executing the instruction in the branch destination (when a break has been set, it occurs
before executing the instruction in the branch destination).
2. Do not set the Event condition for the SLEEP instruction by the program counter (after
execution of the instruction).
Do not set the data access condition before executing one or two instructions in the
SLEEP instruction.
3. If the power-on reset and the Event condition are matched simultaneously, no condition
will be satisfied.
4. If a condition of which intervals are satisfied closely is set, no sequential condition will
be satisfied. Set the Event conditions sequentially, which are satisfied closely, by the
program counter with intervals of two or more instructions.
The CPU is structured as a pipeline; the order between the instruction fetch cycle and
the memory cycle is determined by the pipeline. Accordingly, when the channel
condition is matched in the order of bys cycle, the sequential condition is satisfied.