Installation Guide
SM
SOLAR
MOUNT
INSTALLATION GUIDE
PAGE
ENDCLAMP, FIRST MODULE
K
INSTALL MODULE END CLAMPS: The End
clamp is supplied as an assembly with a 1/2"
hex head bolt that is accessible at the ends of
rails. The clamp should be installed on the
rails prior to installing end modules.
INSTALL END CLAMPS ON RAIL:
Slide end clamp on to rail by
engaging the two t-guide brackets
with the top slot of the rails. Ensure
bolt is extended as far as possible
so that clamp is positioned at max.
distance from end of rail.
POSITION END CLAMPS:
Slide end clamp assembly
on to rail until bolt head
engages with end of rail
End clamps are positioned on
rails prior to the rst end
module and prior to the last
end module.
NOTE: To assist insertion of clamp into
rail slot, Pressure may be applied to
top or side of bracket as shown. Do
not force clamp into rail by pushing
on bolt with excessive force.
INSTALL FIRST MODULE:
Install the rst end module
onto rails with the ange of
the module frame positioned
between end clamps an ends
of rails.
ENGAGE CLAMP: While holding module in position and with
ange in full contact with rail, rotate end clamp bolt until
clamp engages with ange to provide clamp force.
To ensure bolt is not over-torqued, use low torque setting
on drill or If using an impact driver, stop rotation as soon as
impact action of driver begins.
TORQUE VALUE (See table and notes on PG. A)
End clamp bolt to 3 ft-lbs, No anti-seize
For best appearance,
position module ush
with ends of rails. Rails
should not extend more
than 1/2" beyond module.
Module must be fully
supported by rails and
cannot overhang ends
of rails.
1
2 3
1/2"
0"










