Installation guide

148 Advisor Master Programming Guide
Test during holidays
YESTest during holidays
*-Change 0-Skip
Yes: Battery test will always take place, even during holidays.
No: Battery test will not take place during holidays.
Select battery test
Manual battery test
No DGP Battery Testing In Progress
Press ENTER
This allows the ATS panel and DGP batteries to be tested manually. This test
does not affect the automatic battery testing. If a DGP is tested, the DGP number
will be displayed.
How to program
Enter: Move to the next manual battery test display.
Battery test report
All DGP Battery Tested OK
Press ENTER
Displays the results of previous manual battery testing.
How to program
Enter: Move to the next manual battery test display.
Select DGP for battery test
Manual Battery Test For DGP # 1-16
DGP:
Specify the DGP number of the unit to be tested.
DGP 1 to 15
ATS control panel = DGP 16
Only 1 unit at a time can be selected.