Installation guide

Advisor Master Programming Guide 83
Soak test days
Days for Soak Test
Days:
This option sets the numbers of days for the soak test period. It can be set from 0
days to 255 days. Refer to Enable soak teston page 19 for more information.
The default is set to 7 days.
ACPO
NO-ACPO
*-Change 0-Skip
When this option is set, all alarms triggered within the entry time, provided an
entry/exit zone is triggered first, will be dealt with as an A Alarm. They will not
be reported to the CS before the entry time has elapsed. The first zone triggered
after the entry time has elapsed will be reported as an A Alarm. Any zone
triggered after that will be reported as a B Alarm.
EE confirm disable (ACPO)
NO-EE confirm disable (ACPO)
*-Change 0-Skip
When this option is set, all alarms triggered within the entry time, provided an
entry/exit zone is triggered first, will be dealt with as an “A” alarm. They will not
be reported to the CS before the entry time has elapsed. Any zone triggered after
the entry time has elapsed will be reported as an “A” alarm only.
Notes
AB alarm option must be set to Yes in the area database.
Option ACPO” described above must also be set to Yes.
Engineer reset on ACPO zone B alarm
NO-Eng Rst on ACPO Zone B Alarm
*-Change 0-Skip
When this option is set, you do not need an engineer reset when only an “A”
alarm has been triggered
Note: A&B alarm reporting (ACPO)on page 34 must be set to Yes.
Engineer reset for alarm must be set to Yes in zone database and system option.
NFA2P
YES-NFA2P
*-Change 0-Skip
Sets the panel to comply with the NFA2P requirement.